Cedral External Cladding
We provide professional installation of Cedral Lap and Cedral Click fibre cement cladding systems  for commercial, residential and mixed use projects across London and the Home Counties. 
Our cladding solutions deliver durable façades with excellent weather resistance, clean detailing and modern visual appeal, making them ideal for both new build and refurbishment projects.

 

KOBE Projects works with main contractors, developers and façade specialists to install Cedral Lap and Cedral Click cladding systems in full accordance with manufacturer specifications. Our installations deliver high quality finishes, long term durability and full compliance with fire, ventilation and moisture control requirements.

 

Cedral cladding offers both a traditional weatherboard appearance and a clean, contemporary finish, giving architects and clients flexibility in design.

 

 

Our Cedral Cladding Service:

We provide a complete, end to end façade package, managing every stage from substructure to final detailing.

 

Subframes & Support Systems
Installed on timber battens, aluminium rails, adjustable brackets or SFS walling systems, ensuring correct ventilation, drainage and load transfer.

 

Weatherproofing & Moisture Control
Breather membranes, EPDM detailing, ventilation trays, flashings and seals installed to protect the building  envelope.

 

Cedral Installation
Lap and Click boards installed to manufacturer guidance, including correct fixings, expansion allowances and ventilated cavities for a clean, consistent finish.

 

Trims & Finishing Details
Precise installation of corner trims, profiles, window surrounds and joints for both performance and appearance.

 

Fire Protection & Compliance
Cavity barriers, ventilated fire stops and A2-rated sheathing options installed with full documentation for building control approval.

 

 

Integrated with SFS Walling

KOBE Projects delivers both SFS walling and cladding, contractors benefit from fewer interfaces, improved coordination, faster programmes and clear accountability across the building envelope.

 

We need your consent to load the translations

We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.